Boston Public Schools Green Boiler Repairs

Boston Public Schools Green Boiler Repairs

Boston, Massachusetts

The two Chapter 149 Green Boiler Repairs projects, the 78,000 square foot Clarence R. Edwards Middle School and the 98,000 square foot Thomas A. Edison K-8 School, consisted of phased renovations with HVAC design including the demolition of existing boilers, boiler feed units and associated piping, the installation of new central plant heating including new gas fired steam ancillary boiler room equipment, piping distribution systems, insulation, the replacement of existing unit ventilators and air handling equipment throughout the building, new DDC automatic temperature controls for all systems, new plumbing systems design with domestic cold water systems, domestic hot water systems, non-potable water systems, gas piping systems and sanitary piping systems to support the renovations and electrical systems with new boiler room lighting; and power for new mechanical equipment.

Engineering Services Provided: Mechanical, Electrical, Fire Protection, Plumbing, Project Management, Construction Administration

Boston Public Schools Green Boiler Repair

 

 

footer widget

Main Office
311 Great Road
Littleton, MA 01460
Phone: 978.486.4301
Fax: 978.428.0067
info@blwengineers.com
Mailing Address
BLW Engineers, Inc.
P.O. Box 1551
Littleton, MA 01460-1551
Branch Office
40 Shattuck Road
Suite #105
Andover, MA 01810