Mechanical/Plumbing, Electrical and Fire Protection consulting engineering services for 25,107 square foot Memory Support Facility including: new heating, ventilating and air conditioning systems; sanitary drainage system for all plumbing fixtures; natural gas distribution to all gas utilization equipment; domestic cold water system; domestic hot water system; roof/storm drainage; and plumbing fixtures; new wet type sprinkler system except for unheated spaces of combustible construction where a dry system will be required; lighting, power including a new electrical service and site distribution; emergency power systems including emergency generator, fire alarm including fire protective signaling and automatic fire detection systems; power for site lighting, and life safety system; low voltage systems design shall include TV/CATV conduit and boxes; telephone boxes and conduit; security system including electric door strikes, keypads, proximity readers, magnetic locks, times, etc.; magnetic door hold opens at specified doors, sound/paging system, residential Intercom system, and employee time clocks.
Architect: EGA Architects