Mechanical/Plumbing, Electrical and Fire Protection consulting engineering services for office, production area, coffee roasting area and testing area, totaling approximately 5,000 square feet of space including: new heating and ventilating systems with dedicated HVAC systems for the coffee roasting room and testing room; sanitary drainage system for all plumbing fixtures; natural gas distribution to all gas utilization equipment; domestic cold water system; domestic hot water system; and plumbing fixtures and equipment; a wet pipe sprinkler system except for unheated spaces of combustible construction where a dry system is required; lighting, power, fire alarm including fire protective signaling and automatic fire detection systems, and life safety systems.
Client: George Howell Coffee